KIRRAutility (Ku)

KIRRAutility (Ku) is the largest division of the Kirra Tara Project due to the large input required to establish the community and various building projects, infrastructure and other necessary requirements and essential services for the farm to work.

During the 2022-2023 fiscal year, Ku had the greatest budgetary spend of in excess of $187,000. This spend includes the land, the Mitsubishi 1-tonne tip truck, the Subaru Liberty Station Wagon, the Achilles 1.8 tonne mini-excavator, approximately $25,000 for general building materials and $6,000 for the sawmill. The annual budget requirements for Ku is expected to stay high for the next 2 - 3 years, as the community and associated outbuildings are established.

At a detailed level, Ku is responsible for the delivery of underlying services to the farm and community. It has call on the engineering, design and build services of KIRRAmaker (Km) as a priority and works closely with KIRRAnet (Kn) as the infrastructure provider for all Kn projects.

All Ku projects conducted for other divisions will move from design and build to management at the point of hand-over to the joint-venture division.

Some of the detailed works that Ku is in the process of delivering (or has already delivered) includes:

See the Kirra Phase 2 Infrastructure Budget and plan for Power, Water and Gas Collection from each plot.